|
|
|
|
|
 |
|
|
Fabbing Tcase crossmember Day 1 and doing some axle work again.
|
 |
|
 |
Location: Blogs Wesley's Blogs Ftoy #510 |
 |
| Posted by: host |
12/17/2007 6:53 PM |
Build this out of 1 7/8's DOM tubbing so its pretty beefy. Also welded on a fill plug for the front axle and did some work on the pass spring hanger.








|
|
| Permalink |
Trackback |
|
|
|
|
|
|
|
|
|