Blog Entries Minimize
Print  

Blogs By Date Minimize
Print  

Search Blog Minimize
Print  

Blog    
3 Link complete! Minimize
Location: BlogsWesley's Blogs    
Posted by: host 2/11/2007 11:49 PM
I finished up the 3link today. I fabbed 2 brackets. 1 For the upper panhard mount and 1 for the axle panhard mount. I fabbed both from 3x5 square stock i had in the basement. I then fabbed the shock mounts. The lowers I bought from ballistic fab and the uppers i made from some 2x2 sq stock. The brakes are the only thing left. Pics below

I finished up the 3link today.  I fabbed 2 brackets. 1 For the upper panhard mount and 1 for the axle panhard mount. I fabbed both from 3x5 square stock i had in the basement. I then fabbed the shock mounts. The lowers I bought from ballistic fab and the uppers i made from some 2x2 sq stock. The brakes are the only thing left.  Pics below

Upper Mount sitting on the 3x5 stock i cut it from.dscn2030.jpg

dscn2031.jpg

Upper mount welded to the frame. (I had to make it low profile enough so it could clear the spring)

dscn2033.jpg

The lower panhard mount.  Pretty basic.

dscn2034.jpg

Panhard Link

dscn2036.jpg

Pic of mounts installed.

dscn2038.jpg

Shock mounts..  Kinda crappy but they work. I had to make them long so they would clear the spring.

dscn2040.jpg

C before I welded the lower shock mounts to them.

dscn2041.jpg

Shock installed.!

dscn2042.jpg

dscn2043.jpg

Lower mount with link

dscn2044.jpg

Upper mount with link

dscn2045.jpg

Front View

dscn2046.jpg

3qtr view. 

dscn2047.jpg

 

Thats the 3link done.  I have bent the brake lines and have to get the fittings for the MC.  Hopefully this week I get to test it out in the yard.  I still have to cut the junk off the front.

Hopefully it will work well.

 

L8r.

 

Permalink |  Trackback

Your name:
Title:
Comment:
Add Comment   Cancel 

  Home|Blog|Photos|Family|FToy|Guestbook
Copyright 2006 by Wesley Combs Terms Of Use Privacy Statement