|
Started putting parts in place |
|
|
By host on
1/28/2007 8:09 PM
|
|
|
|
All the parts showed up so I got all the perches and buckets welded in and got part of the links ready. It was about a 10 hour day getting this done. Tommorow I will do bushings and try to make some progress on the links.
|
 |
|
Comments (0)
|
More...
|
|
|
|
|
New Links using Crossmember. |
|
|
By host on
1/13/2007 11:52 PM
|
|
|
|
My buddy james came by the house last week and schooled me on linked suspensions. So after some measuring etc he said it would be alot better to put upper link mounts in the crossmember. So Today I started that process and I'm pretty happy with the outcome....
|
 |
|
Comments (0)
|
More...
|
|
|
|
|
|
Ideas for the link setup |
|
|
By host on
1/4/2007 1:14 AM
|
|
|
|
Welp I tore the front Axle out the X tonight and started looking at ideas on the links.
I'm thinking of a radius arm type setup that has 2 lower links that connect to bottom back side of the axle on each side. Then ...
|
 |
|
Comments (0)
|
More...
|
|
|
Getting ready for link suspension. |
|
|
By host on
1/3/2007 11:42 PM
|
|
|
|
Welp I tore the front Axle out the X tonight and started looking at ideas on the links.
I'm thinking of a radius arm type setup that has 2 lower links that connect to bottom back side of the axle on each side
|
 |
|
Comments (0)
|
More...
|
|
|
New Welder. |
|
|
By host on
1/3/2007 3:51 PM
|
|
|
|
I went last night and picked up a new/used welder. It's an ESAB MultiMaster 260 Mig/Tig/Stick machine. I'm really impressed with the condition it was in for 6 years old. Thing works great and came with abour 20# of wire to.
|
 |
|
Comments (0)
|
More...
|
|